PCL : National Arts Centre Architectural Rejuvenation

        The rejuvenation of the National Arts Centre (NAC) performing arts facility, which opened in 1969, includes a new glass façade and the addition of 36,000 square feet of indoor space. The new north atrium includes a new Donor’s Lounge and increases public lobby space, washroom facilities, catering spaces, and private meeting … Read more PCL : National Arts Centre Architectural Rejuvenation

PCL : West Block Rehabilitation

This project consists of the rehabilitation of and new additions to the four-story West Block, one of Canada’s Parliament Buildings. This building received the “Classified” designation in 1987 by the Federal Heritage Buildings Review Office (FHBRO). Besides its unmistakable architectural value, the West Block houses ministers, members of Parliament, their employees, committee rooms, and an … Read more PCL : West Block Rehabilitation

PCL : NW 17th Avenue Bascule Bridge Replacement

Located in Miami, Florida, this four-lane, two-span rack and pinion bascule bridge carries traffic over the Miami River. PCL submitted a low bid to Miami-Dade County for the rehabilitation project, including structural steel refurbishment, sidewalk and roadway grating replacement, concrete spall repair, structural steel painting with lead abatement, class V cleaning and coating, and mechanical … Read more PCL : NW 17th Avenue Bascule Bridge Replacement

PCL : I-275 (SR-93) Himes Avenue to Hillsborough River

  The Florida Department of Transportation contracted PCL to construct Phase I of the Interstate 275 (I-275) widening and improvement program in Tampa. I-275 is a major thoroughfare that traverses downtown Tampa, and is one of the busiest interstates in Florida. The project team constructed nine new bridge structures, a completely revamped drainage system with … Read more PCL : I-275 (SR-93) Himes Avenue to Hillsborough River

PCL : Atlantic Boulevard Bascule Bridge Rehabilitation

Located in Pompano Beach, Florida, this two-span bascule bridge rehabilitation is the first Construction Manager at Risk project in the state of Florida. The project consists of three major phases, including approach span deck demolition and widening, new traffic barrier, new decorative railing, structural steel work, electrical upgrades, new span locks, control house expansion, painting, … Read more PCL : Atlantic Boulevard Bascule Bridge Rehabilitation

PCL : Pearl Harbor Memorial (Q) Bridge (I-95 New Haven)

This project is located on the heavily traveled Interstate 95, the main traffic corridor between New York and Boston. PCL is providing the Connecticut Department of Transportation with their selected and innovative vehicular extradosed, cable-stayed bridge design. This structure will be the first of its kind in the United States, and only the third in … Read more PCL : Pearl Harbor Memorial (Q) Bridge (I-95 New Haven)

PCL : I-75/SR-93A at CR-581 Bruce B Downs Blvd Interchange

PCL provided the Florida Department of Transportation with upgrades to the intersection of Bruce B. Downs Boulevard and Interstate 75 in Tampa, Florida. The PCL project team replaced the existing signalized intersection with a flyover bridge to allow unimpeded access for motorists traveling from westbound Bruce B. Downs Boulevard to southbound Interstate 75. The primary … Read more PCL : I-75/SR-93A at CR-581 Bruce B Downs Blvd Interchange

SR-408 (East-West Expressway) Widening

  Located in Orlando, Florida, this project included roadway widening, AASHTO beam bridge widening, and additional auxiliary lanes for existing and new toll facilities. The bridge widening consisted of both concrete- and steel-driven piles, as well as cast-in-place substructure and superstructure concrete. The 30-inch square concrete piles reached lengths of up to 280 feet, and … Read more SR-408 (East-West Expressway) Widening

PCL : Port of Miami Railroad Bridge

    This project consisted of structural, mechanical, and electrical repairs that would revitalize rail traffic to and from the Port of Miami. Structural repairs included structural steel replacement and upgrades, bolt/rivet replacement, spall repairs, cathodic protection pile-jacket installation, and track replacement. The PCL project team replaced several machinery components, including the Hopkins Frame and … Read more PCL : Port of Miami Railroad Bridge